![]() |
Cool. Upgrading again ;)
Catch you later for results :) regards!!!!!!!!! |
Quote:
|
Quote:
So you can go into the Scheduled Tasks Manager and Run the " Experience Activity "and not get the error? Can anyone else confirm that this works? Now this isn't the recount option, this is manually running the cron. Hopefully the next version will work because it was working in the last Beta. I wish it was still available for download. |
Comment:
Members from my web site have been asking me about their old activity, with experience 3.8.4 rc was reduced a lot !!! Some users used to have 40% , now they have 8%~10% Why is that?, they post daily (at least 2 post per day) NOTE I installed vbexperience radioactivity add. Back to 3.8.4 beta 4 (not RC) and waiting for new versions Regards :) |
Quote:
Where did you find the old beta? I had already deleted mine. |
I saved it on my pc (just in case of an emergency :) )
I don't know if I'm allowed to post it here |
Quote:
Quote:
Anyway, for the next version I included some options to tweak this. Also an additional calculation (also setable) has been implemented: Beginning with the second day the user user is not active, a factor of 0.1 will be reduced, to a max of 9 days. (f.e. User is three days not online, so his activity is multiplied with 0.7, if he goes online, a value of 1.0 will be taken. |
1 Attachment(s)
Quote:
|
Thats the current version.
Very strange. I will include that file into the cron's file xperience_activity.php, let's see if it helps. |
Thanks for update to 3.8.4 RC, Updated with no problems :up:
|
All times are GMT. The time now is 09:15 PM. |
Powered by vBulletin® Version 3.8.12 by vBS
Copyright ©2000 - 2025, vBulletin Solutions Inc.
X vBulletin 3.8.12 by vBS Debug Information | |
---|---|
|
|
![]() |
|
Template Usage:
Phrase Groups Available:
|
Included Files:
Hooks Called:
|